Loading…
Loading…
Name | ID | Label | Description | Type | Access | Class |
---|---|---|---|---|---|---|
fcf_rpo_norm_18 | 4744 | Right Pickoff Stiffness | The right pickoff stiffness normalized to the baseline. | R | Float | 8 |
fcf_run_number_19 | 471D | Meter Verification Run Counter | The run counter for this Meter Verification run. | R | Unsigned | 8 |
fcf_test_result_19 | 475A | Test Result | Test Result | R | Enum | 8 |
fcf_abort_code_19 | 476E | Abort Code | Abort Code | R | Enum | 8 |
fcf_time_19 | 4782 | Transmitter Running Hours at Test | The transmitter's power on time at the time of the test. | R | Unsigned | 8 |
fcf_lpo_norm_19 | 4731 | Left Pickoff Stiffness | The left pickoff stiffness normalized to the baseline. | R | Float | 8 |
fcf_rpo_norm_19 | 4745 | Right Pickoff Stiffness | The right pickoff stiffness normalized to the baseline. | R | Float | 8 |
ED_1_refTemp | 4BBA | 基準温度 | R/W | Float | 32 | |
ED_2_refTemp | 4BBB | 基準温度 | R/W | Float | 32 | |
ED_3_refTemp | 4BBC | 基準温度 | R/W | Float | 32 | |
Name | ID | Label | Description | Type | Access | Class |